KAJIAN MANAJEMEN PROYEK TERHADAP FAKTOR KETERLAMBATAN PENYELESAIAN PROYEK KONSTRUKSI DENGAN METODE RELATIVE IMPORTANCE INDEX (RII) ( Studi Kasus : Pekerjaan Pembangunan Bendung Wanggar Dan Jaringan Irigasi Di Kabupaten Nabire )
Aslam, Andri (2026) KAJIAN MANAJEMEN PROYEK TERHADAP FAKTOR KETERLAMBATAN PENYELESAIAN PROYEK KONSTRUKSI DENGAN METODE RELATIVE IMPORTANCE INDEX (RII) ( Studi Kasus : Pekerjaan Pembangunan Bendung Wanggar Dan Jaringan Irigasi Di Kabupaten Nabire ). Masters thesis, Universitas Muslim Indonesia.
|
Text
1.SAMPUL.pdf Download (6MB) |
|
|
Text
2.HALAMAN PENGESAHAN.pdf Download (9MB) |
|
|
Text
3.ABSTRAK.pdf Download (4MB) |
|
|
Text
5.DAFTAR ISI.pdf Download (207kB) |
|
|
Text
6.BAB I '.pdf Download (556kB) |
|
|
Text
7.BAB II.pdf Download (3MB) |
|
|
Text
8.BAB III.pdf Download (6MB) |
|
|
Text
9.BAB IV.pdf Download (1MB) |
|
|
Text
10.BAB V.pdf Download (113kB) |
|
|
Text
11. DAFTAR PUSTAKA.pdf Download (333kB) |
|
|
Text
12.LAMPIRAN.pdf Download (12MB) |
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | Manajemen Proyek, Keterlambatan Proyek, Bendung, Jaringan Irigasi, Relative Importance Index (RII), Nabire |
| Subjects: | 600 Teknologi dan Ilmu Terapan > 624 Teknik Sipil |
| Divisions: | PASCASARJANA > MAGISTER TEKNIK SIPIL |
| Depositing User: | Adipar Adipar |
| Date Deposited: | 15 Apr 2026 03:46 |
| Last Modified: | 15 Apr 2026 03:46 |
| URI: | http://192.168.168.84/id/eprint/8005 |